ICP Management
One of the most critical elements of a solar park or roof top installation is the connection work into the Distribution Network Operators (DNO) lines or substation. An offer for connection from a DNO will usually comprise two elements, namely contestable and non-contestable works. The contestable element can be undertaken by an Independent Connections Provider (ICP) who must be Lloyds Registered.
ROC Energy specialises in managing both the grid connection and utilisation of ICP’s to speed up connection and reduce the cost of contestable works. Our in-depth knowledge of DNO requirements allows us to efficiently manage the DNO and the ICP to ensure that the grid connection is achieved within the given time frame and allocated budget.
Explore Our Services -
Development
Design
Planning
Grid Connections
ICP Management
Consultation
Finance / Investment
Construction / Installation
Commissioning
Accreditation
Monitoring
O&M